We are aiming to satisfy the calls for of the clients all around the entire world.. Our AdvantagesProducts Big quantity in Inventory, No MOQ required We comply with all the global expectations, this sort of as ISO9001 and TS16949 requirements. Our products are made by modern computerized machinery and tools.
Simple Data
Area: Satin/Mirror/PVD/Plating
Certificate: ISO9001, RoHS, CE , CUPC
OEM/ODM: Available
Shipping and delivery Port:HangEPT
Supply Time: thirty to 50 days
Supply Time period: EXW,FOB,CIF,CFR
Item Specification
Investment EPTT Areas
EPT: Stainless steel, EPTT Metal
Procedure: Dropped wax casting
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd:GBT6414-1999
EPTT Tolerance: CT6 StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd
Excess weight: .1kg to 100kg
Product Assortment: EPTT, aviation, robot EPTT, EPTTry, instruments, EPT, electronics, sanitary ware, pump valves, doorway locks and other stainless metal, carbon steel, alloy steel components
EPT manufactured by ourself – We have 2 CNC cEPTTrs
Total machining process – We have our personal machining, welding, poEPTTng, tests workshops
material components | ||||||
EPTT Composition of EPT | EPT
Composition |
201 | 202 | 304 | 316 | 430 |
C | le0.15 | le0.fifteen | le0.08 | le0.035 | le0.twelve | |
Si | le1.00 | le1.00 | le1.00 | le1.00 | le1.00 | |
Mn | five.five-seven.5 | seven.five-10 | le2.00 | le2.00 | le1.00 | |
P | le0.06 | le0.06 | le0.045 | le0.045 | le0.040 | |
S | le0.03 | le0.03 | le0.030 | le0.030 | le0.030 | |
Cr | thirteen-fifteen | 14-seventeen | 18-twenty | sixteen-eighteen | sixteen-18 | |
Ni | .7-1.one | three.five-four.5 | eight-10 | ten-12 | ||
Mo | 2.-3. | |||||
EPT Residence | EPT Product | 201 | 202 | 304 | 316 | |
Tensile Energy | ge535 | ge520 | ge520 | ge520 | ||
Yield Strength | ge245 | ge205 | ge205 | ge205 | ||
Extension | ge30% | ge30% | ge35% | ge35% | ||
Hardness (HV) | lt105 | lt100 | lt90 | lt90 |
Advantange
- With our personal stainless metal investment decision casting production lines and machining traces, give you 1 cease services.
- With CNC(CNC CEPTTR),we make the tooling by ourselves.JCEP you easiler.
- With 50000 square meters workshop positioned in ZEPTTng town, in close proximity to HangEPT port, transportation is practical.
- Use Germany Spectrometer and Salty Spray to check the raw substance.
- We have 15 engineers with robust capacity in style and deveXiHu (West EPT) Dis.Hu (West EPT) Dis. new products.
- With ISO 9001:2015, ISO 14001 and OHSAS 18001 technique.
- With ERP method,We can give you the creation and delivery data at the 1st time. Also if any good quality problem,We can supply it and give you the answer very fast.
- Rapidly reply within twelve several hours.
EPTT amp Shipping
EPTT Introduction
ABL was launched in 2008 by Kate Liang, started out from a 400 sq. meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and increase our business all more than the entire world.
In 2012, We have bought our products to much more than 200 international locations, and our brand name eXiHu (West EPT) Dis.sted
in far more than 50 international locations in the planet.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,commencing EPTTred into the European and American markets.
In 2014, with quick deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ment, ABL moved to a 50000 square meters factory. We have our personal stainless steel expense casting production lines and also accomplished machining equipments.
In 2015, We set up our administration group. We have cooperated with some unversities and obtaining greater. At the identical time, we are also Alibaba training cEPTTr.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have previously cooperated with some best five hundred EPTTrprises.
2018, ABL focus far more on the Lean Manufacturing and making ready for the up coming 5 several years.
2019, We are likely to develop a screening cEPTTr and obtain the higher sales aim.
Manufacturing Method
Methods | Time | |
EPT Generating | CNC CEPTTr | seven times |
EPTT Approach |
Wax Injection | two days |
Sand Shell Molding | five times | |
DewaXiHu (West EPT) Dis.ng | one times | |
Pouring | one days | |
Cutting | one times | |
EPT | one times | |
Cleansing | one days | |
Machining Process |
CNC | 2 times |
Drilling amp EPTTpping | 2 days | |
EPT | two times | |
Stamping | one times | |
PoEPTTng | 5 times | |
Assembling | EPT Washing | one times |
JCEP Tests | 1 times | |
Assembling | 2 times | |
Remark: The creation time base on stXiHu (West EPT) Dis.Hu (West EPT) Dis.rd amount and procedure |
Our mission
To alter the world’s check out about EPTT product.
To be the leaEPTTin precision casting market
Our dream
- To achieve EPT achievement with all of our clients and provides
- To be an intercontinental renowned model.
- To be a one particular-hundred-yr firm
Following-revenue Service
- Reply you fast in twelve several hours.
- Have someone to comply with up all your inquiry and order.
- We will provide content good quality and charges to you.
FAQ
- Exactly where is your manufacturing facility?
Our factory located in ZEPTTng EPTT, ZheJCEP Province. Factory 50000 square meters with 265 workers.
- What is your payment phrase?
We do T/T, thirty% deposit, stability ahead of supply. We can also accept L/C.
- What is the creation time?
EPTT element want twenty to 30 days.
Balustrade and handrail accessories want twenty five to 35 days.
Faucet and shower want forty to 60 days.
- Is that possible to go to the manufacturing unit?
Certain, we sincerely welcome you to go to our manufacturing unit, we can also decide you from the resort.